Follow our LinkedIn Page for Updates
Planning Award
Project: Francis Scott Key Bridge Rebuild Plan
Agency: Maryland Transportation Authority (MDTA)
Scope: Work necessary to develop the NEPA Categorical Exclusion to allow the rebuild to begin quickly.
Location: I-695 from Quarantine Road to Broening Highway
Cost: Confidential
County/City: Baltimore County, Baltimore City, Anne Arundel County
Firms: RK&K - Baltimore, MD
Green/Sustainability/Environmental
Project: I-95 ETL NB Extension MD 152 Interchange
Agencies: MDTA
Scope: This was a large interchange design and construction project that faced the challenge to expand I-95 while minimizing impacts to trees. Forests, streams and wetlands. Recycled materials were utilized including milling from existing paving and rubblized Concrete.
Location: I-95 – Old Joppa Road Overpass to MD 24 Overpass
MD 152 – Between Franklinville Road and US 40
Cost: $180M
County/City: Baltimore County
Firms: RK&K – Baltimore, MD
Wagman – York, PA
Allan Myers – Baltimore, MD
Innovation
Project: Restroom Improvements Renovations – Package 1 at BWI Airport
Agencies: Maryland Aviation Administration (MAA)
Scope: Renovation of six public restroom groups at BWI Marshall Airport’s terminal. Each renovation expanded the terminal building to accommodate larger toilet stalls and provide extra space for concessions and hold rooms.
Location: BWI Thurgood Marshall Airport
Cost: $55M
County/City: Anne Arundel County
Firms: Jacobs – Baltimore, MD
AECOM – Baltimore, MD
JMT – Hunt Valley, MD
Whiting Turner – Towson, MD
MBE/WBE (Engineering)
Project: Martin State Airport Runway 15-33 Rehabilitation
Agencies: MAA
Scope: Asphalt rehab of the full length of the runway and several connecting taxiways.
Location: Martin State Airport
Cost: $30M
County/City: Baltimore County
Firms: ADCI – Ellicott City, MD
MBE/WBE (Construction)
Project: BWI Pedestrian Walkways Joint Repair Project
Agencies: MAA
Scope: Repair of the upper-level roadway joint systems at pedestrian crosswalks and walkways at the BWI Thurgood Marshall Airport Terminal.
Location: BWI Pedestrian Walkway – Upper-Level Roadway
Cost: $1M
County/City: Anne Arundel County
Firms: Vino Constructions – Bowie, MD
Sub-Contractor (Construction)
Project: Airfield Lighting Vault Relocations at BWI Airport
Agencies: MAA
Scope: New masonry airfield lighting vault building to replace an obsolete existing lighting vault that was beyond its intended life and capacity.
Location: BWI Thurgood Marshall Airport
Cost: $23M
County/City: Anne Arundel County
Firms: Glenelg Construction – Hanover, MD
Bronze Partnering – Project Under $5 Million
Project: Replacement of Retaining Wall Along MD 144
Agencies: SHA
Scope: Replacement of existing stone retaining wall with a new cast in place concrete wall 410 ft in length.
Location: Along Westbound MD 144 Frederick Road Between Dunmore Road and Dungarrie Road
Cost: $1M
County/City: Baltimore County
Firm: Brawner Builders – Cockeysville, MD
Silver Partnering – Project Under $5 Million
Project: I-81 at Maugans Avenue Interchange Improvements
Agencies: SHA
Scope: Roadway improvements, fine milling and resurfacing of Maugans Avenue, along with additional improvements of I-81 SB Ramp M, Northbound Ramp K, and Southbound Ramp M.
Location: I-81 at Maugans Avenue in Washington County
Cost: $3M
County/City: Washington County
Firm: F.O. Day Co., Inc. – Rockville, MD
Gold Partnering – Project Under $5 Million
Project: Croom Road Bridge Replacement
Agencies: SHA
Scope: Bridge Replacement Prestressed Concrete Slab Bridge on MD 382 (Croom Road) over Charles Branch.
Location: MD 382 over Charles Branch
Cost: $5M
County/City: Prince George’s County
Firm: Rustler Construction, Inc. – Upper Marlboro, MD
Bronze Partnering – Project Over $10 Million
Project: I-95 ETL NB Extension MD 152 Interchange
Agencies: MDTA
Scope: This was a large interchange design and construction project that faced the challenge to expand I-95 while minimizing impacts to trees, forests, streams and wetlands.
Location: I-95 – Old Joppa Road Overpass to MD 24 Overpass
MD 152 – Between Franklinville Road and US 40
Cost: $180M
County/City: Baltimore County
Firms: RK&K – Baltimore, MD
Wagman – York, PA
Allan Myers – Baltimore, MD
Silver Partnering – Project Over $10 Million
Project: Replacement of 3 Bridges in the MD 151/MD 151B Interchange
Agency: SHA
Scope: Initiation of a major interchange improvement project, which included the complete replacement of three aging and structurally obsolete bridges within the MD 151 (Sparrows Point Boulevard) / MD 151B (Wharf Road) Interchange.
Location: Limits Blvd (from Schoolhouse Lane to Tradepoint Avenue) and on Wharf Road (from Bethlehem Blvd to Sparrows Point Blvd
Cost: $24M
County/City: Baltimore County
Firms: Wallace Montgomery – Hunt Valley, MD
RK&K – Baltimore, MD
Six M Company - Delta, PA
Gold Partnering – Project Over $10 Million
Project: Debris Removal, Disposal and Cleanup of Francis Scott Key (FSK) Bridge Collapse
Agency: MDTA
Scope: Bridge cleanup after catastrophic collapse.
Location: Francis Scott Key Bridge
Cost: Confidential
County/City: Baltimore County
Firms: CES Consulting – Chesapeake, VA
AECOM – Baltimore, MD
Skanska – Rockville, MD
Modal Awards – Projects Under $5 Million
Baltimore City DOT (BCDOT)
Project: Martin Luther King Jr. Boulevard at Howard Street Improvements
Agency: BCDOT
Scope: Installation of bicycle lanes connecting existing and proposed bike networks, reconstructed sidewalks and traffic signals for ADA compliance, and installed landscaping for aesthetic enhancements.
Location: MLK Blvd. from Eutaw to Chase Streets, Chase Street from N Howard to Cathedral Street, W Read Street from Linden Ave to N Howard Street
Cost: $4M
County/City: Baltimore City
Firm: STV – Baltimore, MD
Civil Construction, LLC – Cheverly, MD
County Engineers Association of Maryland (CEAM)
Project: Howard County’s Henryton Road Bridge Replacement Project
Agency: CEAM
Scope: Replacement of the 90-year-old bridge. Eliminated a 12-ton weight restriction, incorporated accelerated bridge construction techniques and utilized an innovative Maintenance of Traffic approach to minimize traffic impacts and reduce construction duration.
Location: 1.25 miles north of MD 99 (Old Frederick Road) in Marriottsville, MD
Cost: $1M
County/City: Howard County
Firms: Wallace Montgomery – Hunt Valley, MD
Kinsley Construction – York, PA
Maryland Aviation Administration (MAA)
Project: AARF Heating and Vehicle Exhaust Upgrades at BWI Airport
Agency: MAA
Scope: Upgrades to the vehicle bay heating and exhaust ventilation at the Airfield Rescue and Firefighting facility.
Location: BWI Thurgood Marshall Airport, Airfield Rescue and Firefighting Building
Cost: $1M
County/City: Anne Arundel County
Firms: Jacobs – Baltimore, MD
JMT – Hunt Valley, MD
Hill International – Mt. Laurel, NJ
Baltimore Contractors – Glen Burnie, MD
Maryland Transit Administration (MTA)
Project: Metro Rogers Avenue Passerelle Replacement
Agency: MPA
Scope: Replacement of the deteriorated existing Passerelle, a covered pedestrian bridge providing unobstructed wheelchair access from the ADA parking area to the mezzanine level of the Rogers Ave Metro Station, with a prefabricated Hybrid Hollow Steel Section (HSS)/Open Section Through Truss.
Location: Rogers Avenue MTA METRO Station
Cost: $3M
County/City: Baltimore County
Firms: Gannett Fleming – Baltimore, MD
KCI Technologies – Sparks, MD
Nichols Contracting – Columbia, MD
Maryland State Highway Administration (SHA)
Project: US 1 Rhode Island Avenue Trolley Trail
Agency: SHA
Scope: Construction of a shared-use path along US 1 (Rhode Island Avenue) from 41st Place/Charles Armentrout Drive to Farragut Street
Location: Hyattsville, MD – IS 1 (Rhode Island Avenue) from Charles Armentrout Drive to Farragut Street
Cost: $5M
County/City: Prince George’s County
Firms: EBA Engineering – Laurel, MD
Concrete General – Gaithersburg, MD
Modal Awards – Project Over $5 Million
BCDOT
Project: Replacement of Phoenix Road Bridge Over Gunpowder Falls
Agency: BCDOT
Scope: Replacement of the 100+ year-old Phoenix Road Bridge over Gunpowder Falls due to its critical condition.
Location: Phoenix, MD/Phoenix Road North and South of the Bridge and Philpot Road North of the Bridge
Cost: $10M
County/City: Baltimore City
Firms: Prime AE Group – Baltimore, MD
H&H – Annapolis, MD
Concrete General – Gaithersburg, MD
MAA
Project Restroom Improvements Renovations – Package 1 at BWI Airport
Agencies: Maryland Aviation Administration (MAA)
Scope: Renovation of six public restroom groups at BWI Marshall Airport’s terminal. Each renovation expanded the terminal building to accommodate larger toilet stalls and provide extra space for concessions and holdrooms.
Location: BWI Thurgood Marshall Airport
Cost: $55M
County/City: Anne Arundel County
Firms: Jacobs – Baltimore, MD
AECOM – Baltimore, MD
JMT – Hunt Valley, MD
Whiting Turner – Towson, MD
MDTA
Project: Francis Scott Key Bridge Recovery
Agency: MDTA
Scope: Recovery of the collapsed portions of the Key Bridge from the river.
Location: Patapsco River – Key Bridge Spans 17-22
Cost: Confidential
County/City: Baltimore County
Firms: CES Consulting – Chesapeake, VA
AECOM – Baltimore, MD
Skanska – Rockville, MD
MTA
Project: MTA Kirk Bus Division: Battery-Electric Bus Pilot
Agency: MTA
Scope: First deployment of BEBs in MTA’s Core Bus system that serves Greater Baltimore and will inform future deployment of zero-emissions vehicles across the 810-bus fleet.
Location: 2301 Kirk Avenue, Baltimore, MD 21218
Cost: $12M
County/City: Baltimore County
Firms: WSP – Baltimore, MD
Stantec – Baltimore, MD
LilyPad EV – Martinez, CA
SHA
Project: Replacement of 3 Bridges in the MD 151/MD 151B Interchange
Agency: SHA
Scope: Initiation of a major interchange improvement project, which included the complete replacement of three aging and structurally obsolete bridges within the MD 151 (Sparrows Point Boulevard) / MD 151B (Wharf Road) Interchange.
Location: Limits Blvd (from Schoolhouse Lane to Tradepoint Avenue) and on Wharf Road (from Bethlehem Blvd to Sparrows Point Blvd
Cost: $24M
County/City: Baltimore County
Firms: Wallace Montgomery – Hunt Valley, MD
RK&K – Baltimore, MD
Six M Company - Delta, PA
MdQI Project of the Year - Under $5 Million
Project: Henryton Road Bridge Replacement Project
Agency: CEAM and Howard County
Scope: Replacement of the 90-year-old bridge. Eliminated a 12-ton weight restriction, incorporated accelerated bridge construction techniques and utilized an innovative Maintenance of Traffic approach to minimize traffic impacts and reduce construction duration.
Location: 1.25 miles north of MD 99 (Old Frederick Road) in Marriottsville, MD
Cost: $1M
County/City: Howard County
Firms: Wallace Montgomery – Hunt Valley, MD
Kinsley Construction – York, PA
MdQI Project of the Year - Over $5 Million
Project: Francis Scott Key Bridge Recovery
Agency: MDTA
Scope: Recovery of the collapsed portions of the Key Bridge from the river.
Location: Patapsco River – Key Bridge Spans 17-22
Cost: Confidential
County/City: Baltimore County
Firms: CES Consulting – Chesapeake, VA
AECOM – Baltimore, MD
Skanska – Rockville, MD